An Opening for MPE's Closing Numbers
February 28, 2018
Ten years ago this month OpenMPE was holding one of its last contested board elections. Spring meant new questions and sometimes new people asking them. The advocacy group launched in the wake of HP's 3000 pullout notice never had a staff beyond its directors. Once in awhile a 3000 expert like Martin Gorfinkel would be contracted for a project, but most of the time the six to nine volunteers from the 3000 community debated with HP on every request, desire and crazy dream from a customer base stunned into transition.
Directors operated on two-year terms, and those elected in 2008 were the last to serve theirs in the era when HP operated an MPE/iX lab. While the lights were still on at HP, there was some hope homesteaders might receive more help. OpenMPE was in charge of asking, but could report nothing without HP's okay.
OpenMPE never pulled from a deep base of volunteers. Most elections featured the likes of nine people running for seven seats, so a long list of losing candidates was never part of the results. The ballots came through from members of the group via emails. Here at the NewsWire I counted them and had them verified by a board committee. In the biggest of elections we saw 111 votes cast.
The 2008 election revolved around source code licensing for MPE/iX. The vendor would report the last of its end-game strategies by November, and the end of HP's 3000 lab activity was to follow soon after. Support with fixes to security problems and patches would be over at the end of 2008, and that made the election important as well. There was no promise yet of when the source code might be released, to who, or under what conditions. It looked like HP was going to shut down the MPE/iX lab with beta test patches still not moved to general release.
Getting candidate positions on the record was my role. I dreamed up the kinds of questions I wanted HP to answer for me. HP only promised that by 2010 customers would know whether source would be available and to who. A question to candidates was, "Is it acceptable for the vendor to wait until the start of 2010, as it plans to do now?"
The question was more confrontational than the volunteers could ask. HP controlled the terms of the discussion as well as the content. Hewlett-Packard held conference calls with volunteers for the first five years of the group's existence, but the calls stopped in 2008.
Fewer than 30 people ever served on an OpenMPE board. The list was impressive, but keeping good talent like consultant and columnist John Burke or Pivital Solutions' Steve Suraci was tough. Directors like that always wanted more out of HP than the vendor would provide: more transparency, more resources. Of the final three to volunteer, Keith Wadsworth was the only one ever to ask the board to consider if OpenMPE should continue to exist. His election in 2010 gave him the platform to demand an answer. During the next year the directors dwindled to three.
The group was finally granted a license for MPE source, but it had little else as an asset. There was a $10,000 fee due to HP in 2010 for that license which the group couldn't pay. It also didn't have developers who'd polish it toward any productive use among 3000 customers. That source code was like metal stock without a drill press to shape it, or even an operator.
Staffing resource was always an issue. The group did its best work when it pointed out the holes HP had left behind in its migration strategy for customers. A license transfer process would've never surfaced without OpenMPE's efforts. As of this year, license transfers are the only remaining HP 3000 service a customer can get from HP Enterprise.
Continue reading "An Opening for MPE's Closing Numbers" »